Little Bridge Engineer · Strategy
Join the nodes into triangles, then test your bridge.
Stay within the budget. Triangles support the road; steel is stronger and costs more.
Undo, remove a selected beam or clear your additions before testing. Hint highlights one useful beam.
Green: light · Amber: loaded · Red: overloaded. Arrows apart: tension · Together: compression
The bridge gave way. Try adding triangles or stronger beams.
Reach the other bank to win. Rebuild keeps your design; save materials and avoid breaks for three stars.
3 stars: no breaks and at most 90% of budget. 2: no breaks. 1: reach the bank.
Space pauses, T tests, Z undoes and N rebuilds. Leaving the tab pauses and saves; resume manually after reloading. Twelve levels keep separate states and best stars. There is no daily mode.
The twelve projects have different anchors and road layouts: lower trusses, a central pier, overhead arches, towers, sloping banks and missing road segments. Adjacent road joints can be joined to repair a gap. Fixed green supports stay anchored; unanchored joints need a path to a support.
Last updated 2026-10-28